Taking a break...

FixMyStreet is going offline shortly, probably permanently. The software is old and needs a complete rewrite, the site is being bombarded by spammers, and it is debatable whether councils are receiving and/or acting on FixMyStreet reports.

As of now, it is not possible to post new issues, or updates to published issues.

If you have submitted on FixMyStreet, thank you for playing a part in one of Aotearoa/New Zealand's early civic tech projects.

Roadworks dangerous for cyclists

Reported in the Cycle path category anonymously at 03:30, Sun 15 October 2017

Sent to Christchurch City Council 47 sec later.

Javascript is required to view this map.
The eastbound cycle lane on Wigram Rd between Broken Run & Aidanfield Dr has been blocked by roadworks. The 2 advance warning signs are both in the cycle lane, with the second one (ironically the “Extreme Care Cyclists Merging” sign) totally blocking the cycle lane. This situation isn’t helped by this “Cyclists Merging” sign currently having been blown over, so it isn’t providing any advance warning (as well as being even more of a hazard for cyclists since it is a lot less visible when lying flat on the cycle lane). With the cycle lane (and footpath) closed for over 150m in a 60kph speed limit area with narrow (2.75m?) lanes, why isn’t there a Temporary Speed Limit in place (as required by CTOC)?

More issues nearby

This site is a beta version.