Fulton Hogan have again blocked the eastbound cycle lane on Main Road in Moncks Bay (a bit past the yacht club) with a roadworks sign for their Peacock’s Gallop Project. At least the “Please Stop on Request” sign they’d blocked the cycle lane with on Tuesday night is gone (FixMyStreet #9440), but with this 30kph sign hiding in the cycle lane around the bend, it is probably more dangerous.
Since the original 30kph sign (also blocking the cycle lane – see FixMyStreet #9441) is still there just 40m further up the road, not sure what the point of this sign is. Especially as Fulton Hogan now have no advance warning for their manual traffic controller, but do have two 30kph signs blocking the eastbound cycle lane virtually next to each other.