“Cyclist Merging” sign but no roadworks affecting cycle lane (or road)

Reported in the Cycle path category anonymously at 08:30, Tue 14 April 2015

Sent to Christchurch City Council 34 sec later.

Javascript is required to view this map.
Westbound on Fendalton Rd there are gated “Extreme Care Cyclists Merging” signs outside St Barnabas church (Tui St). However, the cycle lane between here and Clyde Rd is not affected by any works – Clyde Rd is the end of the area covered by the TMP (#27784), and is about 500m down the road. Three other roadworks signs for this “worksite” have been either covered up or had the signs taken down (two before the Cyclist Merging signs and one after). Why hasn’t Traffic R Us (the temporary traffic management contractor) taken down the “Cyclists Merging” signs when they no longer apply (just like they’ve taken down or covered three other signs here)? Leaving signs that are no longer relevant up will just cause drivers (& cyclists) to stop paying attention to these types of signs in future.

More issues nearby

Updates

Provide an update

Please note that updates are not sent to the Council.

Issue lifecycle
Please enter a time in 24 hour (eg. HH:MM) format. If no time is included, the default will be midnight on the specified date. The current time is: 24 April 2017 - 1:36pm
Refresh Type the characters you see in this picture. Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.
This site is a beta version.