Roadworks sign blocking cycle lane

Reported in the Cycle path category anonymously at 02:01, Wed 11 October 2017

Sent to Christchurch City Council 38 sec later.

Javascript is required to view this map.
Fulton Hogan have (again) blocked the eastbound cycle lane on Main Road approaching Shag Rock with a roadworks sign for their Peacock’s Gallop Project. Admittedly there isn’t a lot of width to work with here, but Fulton Hogan haven’t even tried to place the sign close to the barrier (signs have previously been placed in this (and nearby) locations on the walkway side of the barrier, with the sign stand hard up against the barrier, which has left enough space for pedestrians to safely get past without jeopardising the safety of cyclists).

More issues nearby

Updates

Provide an update

Please note that updates are not sent to the Council.

Issue lifecycle
Please enter a time in 24 hour (eg. HH:MM) format. If no time is included, the default will be midnight on the specified date. The current time is: 16 November 2018 - 3:31am
This site is a beta version.