Broken footpath - concrete to be removed

Reported in the Footpath/pavement category anonymously at 04:52, Mon 7 February 2011

Sent to Auckland Transport 35 sec later.

Javascript is required to view this map.
Large sections of broken footpath have been left on the grass berm and on top of two water meters by the right-of-way to the walkway. These were left by the electrical contractors who dug up part of the footpath to lay underground electrical cables for the new walkway bridge.