Broken footpath - concrete to be removed

Reported in the Footpath/pavement category anonymously at 05:52, Mon 7 February 2011

Sent to Auckland Transport 35 sec later.

Javascript is required to view this map.
Large sections of broken footpath have been left on the grass berm and on top of two water meters by the right-of-way to the walkway. These were left by the electrical contractors who dug up part of the footpath to lay underground electrical cables for the new walkway bridge.

More issues nearby

Updates

Provide an update

Please note that updates are not sent to the Council.

Issue lifecycle
Please enter a time in 24 hour (eg. HH:MM) format. If no time is included, the default will be midnight on the specified date. The current time is: 15 December 2017 - 9:13pm
Refresh Type the characters you see in this picture. Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.
This site is a beta version.