Footpath needs to be concreted

Reported in the Footpath/pavement category anonymously at 11:39, Tue 18 July 2017

Sent to Auckland Transport 39 sec later.

Javascript is required to view this map.
over 2-3 months ago contractor cut footpath to install fibre but the footpath has not been reinstalled and an open hole remains and it a hazard to pedestrians. Chorus are not interested in fixing

More issues nearby

Updates

Provide an update

Please note that updates are not sent to the Council.

Issue lifecycle
Please enter a time in 24 hour (eg. HH:MM) format. If no time is included, the default will be midnight on the specified date. The current time is: 21 November 2018 - 11:30pm
This site is a beta version.